Hi all, iv had my van for a couple of years now and i had a friend who was going to do all the welding for me but he ended up shitting him self at the amount of work involved and the time it would take lol, so i have now got it booked in at veedubs in welling kent, another mate but this is a pure buisness arangment (better that way)
anyway here is a few pics.
heres one of my new brakes
one of my flat4 brms, i got the mws ones but was not happy with the finish so got these instead
i have got most of my panels but still need a few, the van will be getting a front panel, iner and outer sills both sides (dont need them but rather than a patch job may as well do it) , front outer arches, rear arches, battery trays , rear corner, a couple of gutter sections n/s cab floor,
i know this sounds alot but most of the panels im replacing only need patching but i only want to get it done once so opted for full panels. the guy doing it is just the tits and has been doing vw's for around 18 years, he has had many show winners out of his work shop. i was gona get it done for free by the last mate but in reality that aint gona happen..... i just want the welding done so i can bolt on all my shiny bits
i have got twin 36 webers to go on, a 3 bow roof rack (on a dormobile.. i will come to that another time) , empi wuick shift, autometer rev counter, new alternator conversion. i have spent a shit load on it and not got anywhere near getting it on the road, i could probably spent around £100 and it will go through an mot but it wont look pretty.
i will ad more when the work starts in june
Nick
anyway here is a few pics.
heres one of my new brakes
one of my flat4 brms, i got the mws ones but was not happy with the finish so got these instead
i have got most of my panels but still need a few, the van will be getting a front panel, iner and outer sills both sides (dont need them but rather than a patch job may as well do it) , front outer arches, rear arches, battery trays , rear corner, a couple of gutter sections n/s cab floor,
i know this sounds alot but most of the panels im replacing only need patching but i only want to get it done once so opted for full panels. the guy doing it is just the tits and has been doing vw's for around 18 years, he has had many show winners out of his work shop. i was gona get it done for free by the last mate but in reality that aint gona happen..... i just want the welding done so i can bolt on all my shiny bits
i have got twin 36 webers to go on, a 3 bow roof rack (on a dormobile.. i will come to that another time) , empi wuick shift, autometer rev counter, new alternator conversion. i have spent a shit load on it and not got anywhere near getting it on the road, i could probably spent around £100 and it will go through an mot but it wont look pretty.
i will ad more when the work starts in june
Nick